A new build in Windsong Ranch, wired the right way the first time
Prosper and Celina are the active construction corridor of north Dallas. New phases of Windsong Ranch, Star Trail, Light Farms, and Mustang Lakes break ground every quarter. The window to do the technology correctly closes the moment the insulation goes in. We work with the builders and custom GCs operating in these communities to lay Savant infrastructure during framing — every keypad location, every shade pocket, every speaker prewire, every conduit run for future capability — so the home is ready for the next twenty years without ever opening a finished wall.
You picked the floor plan. You picked the finishes. You walked the lot with the builder. The technology should be in the same conversation as the cabinetry and the trim — not bolted on after move-in. We sit with you and the builder before drywall, walk the framing in your specific Windsong or Light Farms build, and mark up the plans together. Conduit pulled where you will want it. Equipment closet sized correctly. Wireless touchpoints and hardwired keypads coordinated. By final walkthrough the system is alive and you carry one key and one app. The wiring goes in once, before the drywall ever closes.
Who We Help in Prosper & Celina
- You, building new in Windsong Ranch and ready to do the wiring once, properly
- You, in Star Trail, with a custom GC who wants a coordinated low-voltage partner from day one
- You, in Light Farms, who would rather pre-wire than retrofit a finished home
- You, in Mustang Lakes, planning the next-door guest house alongside the main build
- You, near the Founders Classical Academy area, building family-forward and wanting the technology to grow with the kids
How We Do It in Prosper & Celina
A pre-construction meeting with you and your builder — Before framing, we sit with you and your Prosper or Celina builder to align on every technology decision the build needs to accommodate.
Plan markup with locations and conduit runs — We mark up the architectural set with keypad locations, speaker locations, camera locations, shade pockets, equipment closet, and conduit paths. The builder builds to those plans.
Pre-drywall site visit during framing — We walk the framed Windsong or Light Farms build with the GC, verify rough-in locations, and pull structured wiring while the walls are still open.
Trim coordination with your interior designer — We coordinate keypad finishes and locations with your designer so they read as part of the finish package — not as technology bolted onto someone else's vision.
Final install and Savant programming — After drywall, paint, and millwork, we install hardware and program Savant scenes — Morning, Away, Entertain, Pool Party, Goodnight — tuned to how your family actually lives.
Move-in day training — On move-in week we walk you through everything and leave plain-English documentation. Priority support afterward through the new-home shake-out period.
The Frustrations We Hear Most
- The builder's standard low-voltage package will not meet what your family actually wants
- The framing is going up next week and no one has marked keypad locations on the plans
- The structured wiring rough-in already happened and the contractor used too few runs
- The garage is being framed without space for the equipment closet you will need
- The builder's default WiFi is one router and your Windsong build is six thousand square feet
When the System Stops Listening
- A subcontractor cut a structured wiring run during plumbing rough-in
- The Savant system did not commission cleanly the week before move-in
- The builder's low-voltage closet is in the wrong spot and needs to relocate before drywall
- A firmware update broke the integration with the new build's HVAC controls
The Questions People Actually Ask.
Our builder includes a standard smart-home package. Why bring in a separate integrator?
Builder packages are usually a single brand of WiFi router, a video doorbell, and basic switches. They are not a designed system. For a Windsong Ranch or Light Farms build you are living in for twenty years, the right move is a designed Savant system with the prewire done correctly during framing — not bolted onto a finished home after move-in.
How early should you be involved in a new Prosper build?
Before framing if possible. The plan markup happens during the architectural drawing phase. The pre-wire happens during framing. If you bring us in after drywall, every cable becomes a retrofit and the cost roughly triples.
Will you coordinate with our custom GC or do we need to manage it?
We coordinate directly. We are already working with several of the active custom GCs in Prosper and Celina and we slot into their normal subcontractor rhythm. You stay out of the scheduling and we stay in your designer's loop on finishes.
Our Mustang Lakes plan includes a future guest house. Can the prewire account for it?
Yes. We run conduit during the main build to the future guest house pad with enough capacity for a full secondary install. When you eventually build the guest structure, the cabling pull is short and clean instead of a trenching project.


